Network design
Identify the devices and applications in each area. Decide where guest, staff and infrastructure traffic should meet and what should happen if an uplink fails.

Interactive workplace
At the checkout counter
Commercial businesses
Network design
A new register needs access to the inventory system while shoppers use guest Wi-Fi. Walk through the two routes.
Related services and reading
A typical project decision

Separate staff and guest traffic, then trace both paths to the services they need. Identify how the design changes if the primary connection goes offline.
What to bring

Bring site drawings and the locations of switches and carrier handoffs.
How to check the result

The site owner can verify reachability, isolation, failover behavior and the return to normal service.

Design from the application back to the uplink
Choose an application the site needs during an interruption. Trace its path across switching, routing, identity and the external circuit. Compare the normal and backup routes, including power and any equipment they share.
Record the design assumptions and ask the application owner to run the same transaction after the change.
Follow a wireless session
Start at the user’s device and trace the connection through the access point to the wired uplink.
Who accepts the network after deployment?
Start with the operating constraints, compare candidate designs, agree on a deployment window and identify rollback points. Hand over an updated diagram, test results and the maintenance owner for each network boundary.
Prepare a working brief
Design from the application back to the uplink. Use the editable worksheet to name the owner, collect the evidence and record what will count as a completed handoff.
Download the network design worksheet (TXT) · Compare assessment optionsCommon questions
How do we distinguish a wireless issue from an upstream fault?
Record the location, device and time of an interruption. Compare the same application on a wired connection and ask whether nearby users saw the same delay.
Network auditWhat should the network design handoff include?
Record the design assumptions and ask the application owner to run the same transaction after the change.
See the worked example

