← Cloud and software

Azure infrastructure

Map a workload to its compute, identity, storage and network dependencies. Review usage over an ordinary billing period and a peak period before changing capacity.

Azure infrastructure walkthrough

Interactive workplace

What changed on your Azure bill?

Commercial businesses

Azure infrastructure

The monthly bill went up. Before resizing the application, the team needs to know which part of the workload costs more and who can approve a change.

A typical project decision

An application can have spare compute capacity while its storage or network traffic drives cost. Examine costs by resource and owner before recommending a resize.

What to bring

Bring a workload diagram and a redacted cost summary.

How to check the result

The owner can identify the projected effect, rollback step and observation period for each proposed change.

Workload — Named service. Watch — Cost and capacity. Change — Maintenance owner

Give a cloud workload an operating owner

For a business application, follow a capacity alert and a budget variance through the operating team. Confirm who can resize the workload, which dependencies must be checked and how a change is approved outside the normal maintenance window.

Record routine reviews, approved changes, backup ownership and the measures the business owner wants reported.

Move one workload first

Choose a source workload, move a pilot copy and test the application from the user’s device.

Who owns a cost recommendation?

Connect a billing change to its subscription, workload and business owner. Record baseline use, proposed adjustment and a rollback threshold. Schedule a review after the next representative demand cycle.

Prepare a working brief

Give a cloud workload an operating owner. Use the editable worksheet to name the owner, collect the evidence and record what will count as a completed handoff.

Download the azure infrastructure worksheet (TXT) · Compare assessment options

Common questions

What changes the estimate for a cloud move?

Peak demand, data transfer, licensing and services that must still run on site can all change the total. Ask for the assumptions alongside the estimate.

Azure migration readiness
What should the azure infrastructure handoff include?

Record routine reviews, approved changes, backup ownership and the measures the business owner wants reported.

See the worked example