← Field notes

Build a virtualization shortlist from one workload

Choose a representative workload with known storage, networking and recovery dependencies. Use it to compare staying on the current platform, changing hypervisors or moving to a cloud service.

Test the migration assumptions

Build a virtualization shortlist from one workload

Ask each supplier to explain conversion, operating-system support, backup compatibility and any change to licensing. Include the skills your support team would need after the move.

Example working record
Workload
Branch file service
Dependency
Backup integration
Gate
Restore verified

Compare the full operating term

Model hardware, support, subscriptions and the overlap period. Before committing, run an approved pilot and have the application owner test its normal peak workflow and a restore.

Plan the rack handoff

Match the rack position to the plan, then document power, uplinks and the acceptance check.

Which platforms belong in the pilot?

Reuse existing hosts
Include XCP-ng with Xen Orchestra, Proxmox VE and Microsoft Hyper-V in the initial comparison. Give each supplier the same host inventory and ask for written support, migration and backup requirements.
Refresh the cluster
For a proposal using VergeOS, Nutanix or Scale Computing, ask which hardware can be reused, who supports each component and how capacity grows after the first purchase.
Compare like for like
Test the same workload, restore point and outage window on the shortlisted designs. Put the conversion effort and cost of running both platforms beside the recurring price.

Further reading

Common questions

What must be checked before retiring a server?

Identify its scheduled jobs, service accounts and downstream applications. Have each owner test the replacement before setting a retirement date.

Data center planning